|
|
 |
 |
| The Center for Psychiatric Care, was outgrowing its current location at the Stadter Center and needed to expand its facilities. PACES
began construction of the 9,610 square foot CPC building in June of 2005. The new building gave them much needed space while also remaining connected to the
existing Stadter Center, which it shares many of its services with. The design and use of exterior materials of this addition carefully matches the existing
structure that it connects to, providing visual continuity.
.
|
|